Wednesday, April 24, 2013
1/2 Bath
The half bath was not originally part of the project. But, after thinking about it, it seemed a little silly to have a beautifully redone downstairs with a 1960's bathroom. It was a wise choice.
The bathroom is really tiny, so it is hard to get a full picture with all the little details. We redid the drywall, moldings, and fixtures. It was a total gut job! It's hard to see but the wall color comes from swirls in the floor tile. The mirror was a lucky find at Pier 1.
Here's the final outcome!
The bathroom is really tiny, so it is hard to get a full picture with all the little details. We redid the drywall, moldings, and fixtures. It was a total gut job! It's hard to see but the wall color comes from swirls in the floor tile. The mirror was a lucky find at Pier 1.
Here's the final outcome!
Monday, April 22, 2013
Poor Neglected Blog
There's really no excuse for it. I have neglected this baby, er blog, for far too long. It doesn't whine for attention, cry for food, wake me up at night..... so it was pushed to the wayside. My apologies baby blog.
Now seriously. Between being displaced inside our home for so many months, ski season, and just the normal every day tasks that come along with 3 small children, I have simply not had enough energy to chronicle the construction. Hindsight, probably should have made the time so that the trials and horrors that surrounded the project would have been accurately remembered in both detail and chronology.
Let's just say everything that could have gone wrong, went wrong. In no particular order:
1. Demo before permits. Never Again! Extra weeks of living in chaos for no reason!
2. Contractor not protecting air vents and workers turning on the a/c. Thus, sucking all the debris and dust into our unit and circulating all around the house. There was an additional $1000 we charged back to him to get it all cleaned out!
3. Painters painting walls in the wrong color. Thank you contractor for handing out the wrong paint cans!
4. Fireplace brick installed before piping put in behind the stone to hide the wiring.
5. 2 different dye lots being used on the brick being installed. Huge difference in the coloring - what was the installer blind? Or maybe he just didn't give 2 sh&*s?!
6. Running of the gas line for the fireplace (without permits of course) in the exact way that I said not too so that it would just need to be rerouted later.
7. The architects drawings being off 12" causing the gas line for the ranges to be installed in the wrong location. It would have been too much for anyone to double check measurements before the install, right?
8. The wrong granite being cut and delivered for installation at 8 pm. And they had the nerve to pause to see if we would just say we love it and don't worry about the mistake. But how could we - it was black, we ordered brown? So, not even close!
9. Waiting for a cabinet to be delivered for over 2 months, when the contractor kept telling us it was on the truck for delivery to the warehouse. That's some drive from South Carolina!
10. Braking of the fireplace flue handled and completely forgetting to fix it.
11. Sealing the cord for the blinds into the skim coat placed on the slab floor to level it. Morons!
12. Having to cut down cabinetry because they ordered the wrong depth!
13. Build drawers for cabinetry because they ordered the wrong cabinets!
14. Installing broken limestone for the threshold between the foyer and the bathroom. Like we wouldn't notice the huge crack!
15. Failing inspections for stupid mistakes or because no one was actually here to meet the inspector!
16. Installing a new water heater and not bothering to get permits, install it to code, set the thermostat (yes it was scalding hot!), or make sure it was vented properly so that CO2 was not getting into the house.
17. And my new floors. What a nightmare! Let's just say after refinishing them 3 times in 4 months the contractor now owes us a second brand new floor. (this is a very simple version of the story - the full one is just too horrific to write out!)
Once the floors are replaced I am sure this will all become one fantastic story that Evan and I can laugh about. But for now it is a huge thorn in our side!
Here are some photos of the house now.
Now seriously. Between being displaced inside our home for so many months, ski season, and just the normal every day tasks that come along with 3 small children, I have simply not had enough energy to chronicle the construction. Hindsight, probably should have made the time so that the trials and horrors that surrounded the project would have been accurately remembered in both detail and chronology.
Let's just say everything that could have gone wrong, went wrong. In no particular order:
1. Demo before permits. Never Again! Extra weeks of living in chaos for no reason!
2. Contractor not protecting air vents and workers turning on the a/c. Thus, sucking all the debris and dust into our unit and circulating all around the house. There was an additional $1000 we charged back to him to get it all cleaned out!
3. Painters painting walls in the wrong color. Thank you contractor for handing out the wrong paint cans!
4. Fireplace brick installed before piping put in behind the stone to hide the wiring.
5. 2 different dye lots being used on the brick being installed. Huge difference in the coloring - what was the installer blind? Or maybe he just didn't give 2 sh&*s?!
6. Running of the gas line for the fireplace (without permits of course) in the exact way that I said not too so that it would just need to be rerouted later.
7. The architects drawings being off 12" causing the gas line for the ranges to be installed in the wrong location. It would have been too much for anyone to double check measurements before the install, right?
8. The wrong granite being cut and delivered for installation at 8 pm. And they had the nerve to pause to see if we would just say we love it and don't worry about the mistake. But how could we - it was black, we ordered brown? So, not even close!
9. Waiting for a cabinet to be delivered for over 2 months, when the contractor kept telling us it was on the truck for delivery to the warehouse. That's some drive from South Carolina!
10. Braking of the fireplace flue handled and completely forgetting to fix it.
11. Sealing the cord for the blinds into the skim coat placed on the slab floor to level it. Morons!
12. Having to cut down cabinetry because they ordered the wrong depth!
13. Build drawers for cabinetry because they ordered the wrong cabinets!
14. Installing broken limestone for the threshold between the foyer and the bathroom. Like we wouldn't notice the huge crack!
15. Failing inspections for stupid mistakes or because no one was actually here to meet the inspector!
16. Installing a new water heater and not bothering to get permits, install it to code, set the thermostat (yes it was scalding hot!), or make sure it was vented properly so that CO2 was not getting into the house.
17. And my new floors. What a nightmare! Let's just say after refinishing them 3 times in 4 months the contractor now owes us a second brand new floor. (this is a very simple version of the story - the full one is just too horrific to write out!)
Once the floors are replaced I am sure this will all become one fantastic story that Evan and I can laugh about. But for now it is a huge thorn in our side!
Here are some photos of the house now.
![]() |