I started a new blog just about baking. Follow me at:
http://juliescustomconfections.blogspot.com
Thanks! Can't wait to see you there!
The Misadventures of a Mom of 3
Starting backwards, finishing forwards, and loving every moment in between!
Wednesday, August 28, 2013
Wednesday, April 24, 2013
1/2 Bath
The half bath was not originally part of the project. But, after thinking about it, it seemed a little silly to have a beautifully redone downstairs with a 1960's bathroom. It was a wise choice.
The bathroom is really tiny, so it is hard to get a full picture with all the little details. We redid the drywall, moldings, and fixtures. It was a total gut job! It's hard to see but the wall color comes from swirls in the floor tile. The mirror was a lucky find at Pier 1.
Here's the final outcome!
The bathroom is really tiny, so it is hard to get a full picture with all the little details. We redid the drywall, moldings, and fixtures. It was a total gut job! It's hard to see but the wall color comes from swirls in the floor tile. The mirror was a lucky find at Pier 1.
Here's the final outcome!
Monday, April 22, 2013
Poor Neglected Blog
There's really no excuse for it. I have neglected this baby, er blog, for far too long. It doesn't whine for attention, cry for food, wake me up at night..... so it was pushed to the wayside. My apologies baby blog.
Now seriously. Between being displaced inside our home for so many months, ski season, and just the normal every day tasks that come along with 3 small children, I have simply not had enough energy to chronicle the construction. Hindsight, probably should have made the time so that the trials and horrors that surrounded the project would have been accurately remembered in both detail and chronology.
Let's just say everything that could have gone wrong, went wrong. In no particular order:
1. Demo before permits. Never Again! Extra weeks of living in chaos for no reason!
2. Contractor not protecting air vents and workers turning on the a/c. Thus, sucking all the debris and dust into our unit and circulating all around the house. There was an additional $1000 we charged back to him to get it all cleaned out!
3. Painters painting walls in the wrong color. Thank you contractor for handing out the wrong paint cans!
4. Fireplace brick installed before piping put in behind the stone to hide the wiring.
5. 2 different dye lots being used on the brick being installed. Huge difference in the coloring - what was the installer blind? Or maybe he just didn't give 2 sh&*s?!
6. Running of the gas line for the fireplace (without permits of course) in the exact way that I said not too so that it would just need to be rerouted later.
7. The architects drawings being off 12" causing the gas line for the ranges to be installed in the wrong location. It would have been too much for anyone to double check measurements before the install, right?
8. The wrong granite being cut and delivered for installation at 8 pm. And they had the nerve to pause to see if we would just say we love it and don't worry about the mistake. But how could we - it was black, we ordered brown? So, not even close!
9. Waiting for a cabinet to be delivered for over 2 months, when the contractor kept telling us it was on the truck for delivery to the warehouse. That's some drive from South Carolina!
10. Braking of the fireplace flue handled and completely forgetting to fix it.
11. Sealing the cord for the blinds into the skim coat placed on the slab floor to level it. Morons!
12. Having to cut down cabinetry because they ordered the wrong depth!
13. Build drawers for cabinetry because they ordered the wrong cabinets!
14. Installing broken limestone for the threshold between the foyer and the bathroom. Like we wouldn't notice the huge crack!
15. Failing inspections for stupid mistakes or because no one was actually here to meet the inspector!
16. Installing a new water heater and not bothering to get permits, install it to code, set the thermostat (yes it was scalding hot!), or make sure it was vented properly so that CO2 was not getting into the house.
17. And my new floors. What a nightmare! Let's just say after refinishing them 3 times in 4 months the contractor now owes us a second brand new floor. (this is a very simple version of the story - the full one is just too horrific to write out!)
Once the floors are replaced I am sure this will all become one fantastic story that Evan and I can laugh about. But for now it is a huge thorn in our side!
Here are some photos of the house now.
Now seriously. Between being displaced inside our home for so many months, ski season, and just the normal every day tasks that come along with 3 small children, I have simply not had enough energy to chronicle the construction. Hindsight, probably should have made the time so that the trials and horrors that surrounded the project would have been accurately remembered in both detail and chronology.
Let's just say everything that could have gone wrong, went wrong. In no particular order:
1. Demo before permits. Never Again! Extra weeks of living in chaos for no reason!
2. Contractor not protecting air vents and workers turning on the a/c. Thus, sucking all the debris and dust into our unit and circulating all around the house. There was an additional $1000 we charged back to him to get it all cleaned out!
3. Painters painting walls in the wrong color. Thank you contractor for handing out the wrong paint cans!
4. Fireplace brick installed before piping put in behind the stone to hide the wiring.
5. 2 different dye lots being used on the brick being installed. Huge difference in the coloring - what was the installer blind? Or maybe he just didn't give 2 sh&*s?!
6. Running of the gas line for the fireplace (without permits of course) in the exact way that I said not too so that it would just need to be rerouted later.
7. The architects drawings being off 12" causing the gas line for the ranges to be installed in the wrong location. It would have been too much for anyone to double check measurements before the install, right?
8. The wrong granite being cut and delivered for installation at 8 pm. And they had the nerve to pause to see if we would just say we love it and don't worry about the mistake. But how could we - it was black, we ordered brown? So, not even close!
9. Waiting for a cabinet to be delivered for over 2 months, when the contractor kept telling us it was on the truck for delivery to the warehouse. That's some drive from South Carolina!
10. Braking of the fireplace flue handled and completely forgetting to fix it.
11. Sealing the cord for the blinds into the skim coat placed on the slab floor to level it. Morons!
12. Having to cut down cabinetry because they ordered the wrong depth!
13. Build drawers for cabinetry because they ordered the wrong cabinets!
14. Installing broken limestone for the threshold between the foyer and the bathroom. Like we wouldn't notice the huge crack!
15. Failing inspections for stupid mistakes or because no one was actually here to meet the inspector!
16. Installing a new water heater and not bothering to get permits, install it to code, set the thermostat (yes it was scalding hot!), or make sure it was vented properly so that CO2 was not getting into the house.
17. And my new floors. What a nightmare! Let's just say after refinishing them 3 times in 4 months the contractor now owes us a second brand new floor. (this is a very simple version of the story - the full one is just too horrific to write out!)
Once the floors are replaced I am sure this will all become one fantastic story that Evan and I can laugh about. But for now it is a huge thorn in our side!
Here are some photos of the house now.
![]() |
| Fireplace without TV |
| New Playroom Carpeting |
| New Office Carpeting |
Sunday, November 11, 2012
Quit Your Day Job
Today my baby turned 3. Happy birthday! He had a great day playing with his brother and sister and an even better day exerting his big boy independence by not letting me carrying him in the parking lot. Great for him, sad for mommy.....but I digress. So not the point of this post.
For the first time in a very long time I had to purchase the birthday cake. All the cakes I had pre-baked and frozen for this special occasion have become a feast for the squirrels thanks to the lack of power to my freezer last weekend. Waiting until the very last moment (so like me), I went to the supermarket and grabbed a chocolate cake with white buttercream icing featuring balloons and a green border. Perfect for a little boy, sort of. But, it would work.
Completely surprised that there is a person actually working in the bakery at close to 5 pm on a Sunday night, I first ask if he could write on the cake. Yes. Could he write Happy Birthday Carter. Close. He could probably fit Happy B-Day Carter. Awesome. I'll take that. Spares me having to dig through boxes to find the right decorating tools to write the dame thing.
This is what the final product looked like.
For the first time in a very long time I had to purchase the birthday cake. All the cakes I had pre-baked and frozen for this special occasion have become a feast for the squirrels thanks to the lack of power to my freezer last weekend. Waiting until the very last moment (so like me), I went to the supermarket and grabbed a chocolate cake with white buttercream icing featuring balloons and a green border. Perfect for a little boy, sort of. But, it would work.
Completely surprised that there is a person actually working in the bakery at close to 5 pm on a Sunday night, I first ask if he could write on the cake. Yes. Could he write Happy Birthday Carter. Close. He could probably fit Happy B-Day Carter. Awesome. I'll take that. Spares me having to dig through boxes to find the right decorating tools to write the dame thing.
This is what the final product looked like.
Seriously?!?!?! It looks like Marleigh....or even worse, Evan, wrote it. I didn't realize that when I asked him if he could write on the cake I should have been asking if he had 1. done it before and 2. had decent penmanship.
Quit your day job, Mr. Bakery Worker. Cake decorating is just not your thing!
Thursday, November 8, 2012
Oh Power, Where Art Thou?
Last night was night #10 without electricity. While it is a major inconvenience, we are fortunate to have our home and the ability to replace the food we lost. We are able to intermittently have power.
Now, if only the generator would work properly!!! Yup, to add insult to injury last weekend the generator start to shake so bad that the plug to the house actually dislodged causing the freezer and the refrigerator to fully defrost. Then, it managed to shimmy so much that a wheel fell off! All the time, the fuses kept blowing leaving us with half power, wondering how this could keep happening when we have barely anything to generate! But something is better than nothing, right?!
Right. But it is November in New Jersey and the temperature is rapidly decreasing. And the Nor Easter (how do you spell that?!) coming in doesn't add much comfort to a house that is already hovering near 48 degrees. My mission became to get heat into the house for my family. And thanks to the guys at Drx Duct, I can now safely turn on the heat without worry that construction dust is being blown throughout my house.
Feeling confident that we can withstand the impending snow storm with no true electricity, I go about my day of wrangling my stir-crazy kids, waiting for the air ducts to be finished, and babysitting the construction workers. It is about 3 pm and the generator has already eaten through almost a full tank of gas. So much for 10 hour run time! One of the workers is kind enough to refuel the generator for a second time. And within seconds, the lights go out. Thinking it was just a fuse I ask him to go reset the buttons, as it is already snowing and I had one of the kids with me. Nothing. Not a blown fuse. Not out of gas. Oil is fine. Generator roars like before. But the darn thing won't produce power.
You have got to be kidding me?!?!?! I call Evan, who is working in New York City, and insinuate to him that it is time to come home. He asks out neighbor, Matt, to take a ride to my parents' house with him after work to pick up a generator they had just bought but were not using. It was in the car locked in the garage. Now, my parents are actually staying in PA because they have no power and were fortunate enough to find the generator there but had to switch cars when they came back to NJ to vote. The only hitch was the car keys were in PA and my father could not remember whether or not he locked the door. We were banking on he didn't.
Evan and Matt take the 25 minute drive there at 7 pm only to find that the car doors were indeed locked. A quick search of the house via flashlight (good thing the neighbors didn't call the cops!) confirmed that there were no spare keys. The next logical solution - pick the lock. They do it all the time on T.V. Plus, Matt is a firefighter so shouldn't he know how to open a locked car door? Yeah, that would be a big fat no. According to him, firefighters are trained to smash windows, police are trained to pick the locks. Some first responder he is?!?!
Realizing their attempt at thievery was futile they start heading towards PA to get the car keys. It is now freezing in the house and even though the kids are bundled up and asleep, I am getting really concerned. Evan, Matt and my parents agree to start driving towards each other and meet in the middle on Route 80. Don't forget there is a huge storm outside with 40 mph winds and snow. They get to exit 14 (28 miles from our house in NJ and probably about the same from the house in PA). Ready for a quick grab-and-go, Evan and Matt reach my parents only to find that they are senile and didn't actually bring the keys with them!!!!!
Up to PA and up the mountain they all went. The boys got the keys and headed home. They stopped on our block to check Matt's house and then went straight back to my parents' house to grab the generator. They finally got back and had it hooked up at 1:11 am.
Do I have the greatest husband and neighbor or what?!?!
Now if only the power company could put as much time and effort in to fully restore our power as the boys did to restore the temporary one!
Now, if only the generator would work properly!!! Yup, to add insult to injury last weekend the generator start to shake so bad that the plug to the house actually dislodged causing the freezer and the refrigerator to fully defrost. Then, it managed to shimmy so much that a wheel fell off! All the time, the fuses kept blowing leaving us with half power, wondering how this could keep happening when we have barely anything to generate! But something is better than nothing, right?!
Right. But it is November in New Jersey and the temperature is rapidly decreasing. And the Nor Easter (how do you spell that?!) coming in doesn't add much comfort to a house that is already hovering near 48 degrees. My mission became to get heat into the house for my family. And thanks to the guys at Drx Duct, I can now safely turn on the heat without worry that construction dust is being blown throughout my house.
Feeling confident that we can withstand the impending snow storm with no true electricity, I go about my day of wrangling my stir-crazy kids, waiting for the air ducts to be finished, and babysitting the construction workers. It is about 3 pm and the generator has already eaten through almost a full tank of gas. So much for 10 hour run time! One of the workers is kind enough to refuel the generator for a second time. And within seconds, the lights go out. Thinking it was just a fuse I ask him to go reset the buttons, as it is already snowing and I had one of the kids with me. Nothing. Not a blown fuse. Not out of gas. Oil is fine. Generator roars like before. But the darn thing won't produce power.
You have got to be kidding me?!?!?! I call Evan, who is working in New York City, and insinuate to him that it is time to come home. He asks out neighbor, Matt, to take a ride to my parents' house with him after work to pick up a generator they had just bought but were not using. It was in the car locked in the garage. Now, my parents are actually staying in PA because they have no power and were fortunate enough to find the generator there but had to switch cars when they came back to NJ to vote. The only hitch was the car keys were in PA and my father could not remember whether or not he locked the door. We were banking on he didn't.
Evan and Matt take the 25 minute drive there at 7 pm only to find that the car doors were indeed locked. A quick search of the house via flashlight (good thing the neighbors didn't call the cops!) confirmed that there were no spare keys. The next logical solution - pick the lock. They do it all the time on T.V. Plus, Matt is a firefighter so shouldn't he know how to open a locked car door? Yeah, that would be a big fat no. According to him, firefighters are trained to smash windows, police are trained to pick the locks. Some first responder he is?!?!
Realizing their attempt at thievery was futile they start heading towards PA to get the car keys. It is now freezing in the house and even though the kids are bundled up and asleep, I am getting really concerned. Evan, Matt and my parents agree to start driving towards each other and meet in the middle on Route 80. Don't forget there is a huge storm outside with 40 mph winds and snow. They get to exit 14 (28 miles from our house in NJ and probably about the same from the house in PA). Ready for a quick grab-and-go, Evan and Matt reach my parents only to find that they are senile and didn't actually bring the keys with them!!!!!
Up to PA and up the mountain they all went. The boys got the keys and headed home. They stopped on our block to check Matt's house and then went straight back to my parents' house to grab the generator. They finally got back and had it hooked up at 1:11 am.
Do I have the greatest husband and neighbor or what?!?!
Now if only the power company could put as much time and effort in to fully restore our power as the boys did to restore the temporary one!
Tuesday, October 30, 2012
Surviving Sandy
After years of my house loosing power and flooding with every storm that rolls through I can finally say we have "getting storm ready" down to a science. It took years of lessons learned to know that we need everything in our yard locked away (not just tied down), and power to prevent our house from flooding! After months of searching last year after Irene we were lucky to purchase a generator in Pennsylvania. We were even more fortunate to have the electrician working on our remodel come before the storm and hardwire the generator to our house's electrical panel.
Hurricane Sandy came through my town with a vengeance. I guess she didn't get the memo that parts of Parsippany are still trying to recover from Hurricane Irene's wrath last year.
I live that the end of a very long street that ends with a cul-de-sac. There are two other streets off of my street - both dead ends. A tree fell at the top of my street, taking out an electrical transformer, and essentially blacking out my whole neighborhood and trapping us in. Nothing like being stuck in the dark with no way out! Thank heavens for a generator!
I can honestly say that loosing power for days makes me and my family very blessed this time around. My next door neighbor was not so lucky.
![]() |
| front of house |
![]() |
| driveway with 3 cars |
| garage side of house |
| master bedroom |
![]() |
| garage roof & chimney |
![]() |
| view of the front of the house from my front yard |
Unfortunately, with the construction in our house still ongoing our house isn't the most cozy home to stay in. No heat yet and no downstairs (kitchen, family room, dining room, etc). But, with the kids bunking in our room last night we were able to offer our neighbors a bed to sleep. Only wish we could have done more!
Monday, October 8, 2012
It can only be good for a while
So, we were so excited to get the permits and shift this project into full gear. Too bad our pets have conspired against us! It seems that Shadow, our 80 lb Australian cattle dog, passed along the fleas she had at the end of August to our cat Sienna. No clue how, as the two live on separate floors. Nor do I understand why we had no signs of fleas for about 4 weeks (2 weeks longer then the supposed hatching period). But we had them, no doubt about that. We all have the fleas bites to prove it.
Instead of working all day Saturday, everyone had to be evacuated from the house so that it could be bombed! Do you know how hard it is to get everything off the floor and away from the corners of rooms when your house is in complete and utter disarray?!?! Not to mention how hard it is to vacuum concrete slab floors (not that I even attempted it)?
I am slowly coming to the top of the laundry pile because, yes, everything in the house has to be washed. I see the light at the end of the tunnel of fleas! One more bombing in 2 weeks and these pesky critters should be all gone. Keep your fingers (and toes) crossed!
Instead of working all day Saturday, everyone had to be evacuated from the house so that it could be bombed! Do you know how hard it is to get everything off the floor and away from the corners of rooms when your house is in complete and utter disarray?!?! Not to mention how hard it is to vacuum concrete slab floors (not that I even attempted it)?
I am slowly coming to the top of the laundry pile because, yes, everything in the house has to be washed. I see the light at the end of the tunnel of fleas! One more bombing in 2 weeks and these pesky critters should be all gone. Keep your fingers (and toes) crossed!
Friday, October 5, 2012
Oh Happy Days!!!!
After weeks and weeks of waiting, we finally got the PERMITS!!!!!!
Yeah! We can finally schedule the inspections and get this project moving!
Yeah! We can finally schedule the inspections and get this project moving!
Friday, September 28, 2012
And then there was nothing!
So, the process has been slow but steady. It seems that whoever enters the permit applications in the computer at the building department in Parsippany let ours sit on their desk for weeks before entering it into the system. That's 2 weeks we were "waiting for the permits" that were never on the cusp of coming. That's 2 weeks we have been living in demolition mode without the hopes of moving forward. The town says we should get the permits 10-20 business days after they entered it into system, which was September 19th. Once we get the permits, our trusty contractor says he should be done in 2-3 weeks. I will believe it when I see it! I use to hope he would be out by Halloween. Now I am praying for Thanksgiving!
Here's the house looked like this morning:
The funny things is that without the walls, the sound upstairs just deadened. There was nothing to bounce off of so the children's screaming and singing was actually quite tolerable, even though the state of disarray was not.
By the time we get home from a weekend away, all of the drywall should be back up and almost ready to be painted! It would be nice to feel like progress was being made!
And, if you are asking how the drywall can go back up without the permits. This part of the project was not on the original plans....just an add on during the whole construction process. Therefore, it could be completed without waiting. Plus, there are no structural changes being made in the hallways, which makes it nice and easier.
I keep telling the contractor - the longer he takes to complete the project the more things I will add to his list!
Here's the house looked like this morning:
| The view from the kitchen into the family room. |
![]() |
| The upstairs hallway down to the studs. |
![]() |
| The top of the stairwell. |
![]() |
| Kitchen into the dining room. |
![]() |
| Stairway looking up - don't grab the railings! They aren't actually connected to anything! |
![]() |
| Better view of the upstairs. |
The funny things is that without the walls, the sound upstairs just deadened. There was nothing to bounce off of so the children's screaming and singing was actually quite tolerable, even though the state of disarray was not.
By the time we get home from a weekend away, all of the drywall should be back up and almost ready to be painted! It would be nice to feel like progress was being made!
And, if you are asking how the drywall can go back up without the permits. This part of the project was not on the original plans....just an add on during the whole construction process. Therefore, it could be completed without waiting. Plus, there are no structural changes being made in the hallways, which makes it nice and easier.
I keep telling the contractor - the longer he takes to complete the project the more things I will add to his list!
Tuesday, September 11, 2012
It's OFFICIAL!!!!!!
The dumpster arrived today for our interior renovations project. I can't believe the day is here. I am excited, but mostly freaked out. What are we doing? Are we nuts? Hope this all comes together?!
The truck driver was nice enough to let my truck loving son lower the dumpster onto the driveway.
Here the before demolition pictures.
| Goodbye brick wall....hello built-in shelving and beautiful stone fireplace! |
| I won't be missing you uneven, incomplete, warping floors. |
![]() |
| And to the wall that always blocked the view, I say see you later! |
| It was sad to see you go kitchen. What will I do without you for the next month?! |
| And to you, single oven that is only 24" wide....don't let the door hit you on the way out! |
And this is what things look like now:
Don't all kitchen cabinets belong in the driveway?
![]() |
| Oh, me! Oh, my! There's no turning back now!!!!!!! |
Subscribe to:
Posts (Atom)
















